Contractor: Ross F. Carroll Inc.
This project will add extensive streetscape beautification and repair the
asphalt at some of the most traveled roadways in Ripon. The City of Ripon has
been awarded $3.5 million to construct this project. To receive this grant, the
construction contract must be awarded by December 6, 2007. The project includes
improvements to the following:
Main Street from Wilma Ave to Acacia Ave [click to see renderings]
This section of Main Street will include replacing the asphalt concrete with
pavers, new curb, gutter, and sidewalk (where needed), extensive streetscape
beautification including new planter area, landscaping, and decorative lighting.
Stockton Ave from Main Street to Second Ave
[click to see renderings]
Similar to the Main Street section of the project, the asphalt concrete will be
replaced with pavers, new curb, gutter and sidewalk will be replaced where
needed, extensive streetscape beautification including new planter area,
landscaping, and decorative lighting.
Wilma Avenue from Main Street to Second Ave
The asphalt concrete has failed in this section of roadway. As part of this
project, the existing asphalt concrete will be removed and replaced.
Update (05/12/2008):
The first phase of the project is currently underway. This phase consists of the removal and replacement of the curb, gutter and sidewalk. The asphalt on the south side of Main Street has been removed. Removal of the curb, gutter and sidewalk on the south side of Main Street is complete. Construction of the new curb, gutter and sidewalk on the south side of Main Street is underway and will continue into the next couple of weeks. Most of the storms drain pipe and manholes have been installed. The new water main line installation is complete.
The second phase will begin shortly and portions of Main St. will remain
closed for a number of weeks. The dates and affected areas will be posted as
soon as a start date has been established.
Wilma Avenue construction is currently underway and the final layer of
asphalt will be placed and finished this week. The Main/Wilma intersection will
remain on flash for another couple of weeks so please drive with caution.
[Main Street
Schedule]
For questions about this project please contact
Barbara Schneider at (209) 599-2108 or by email at